Sanbouk Construction announces that it has established an exclusive collaboration with Elkharafi National to bring one of its most important projects in Egypt (El-Shabab simple cycle power plant (Deep Wells) project.

we Provide automatic rotary drilling rigs for construction work on site, including all necessary plumbing. supports, cables and any accessories for good operating conditions. Provide all direct and indirect skilled labor needed to carry out the work. Unpacking and checking of pumps before installation on site, loading of equipment from the storage area, transport of equipment to its place of assembly, unloading and assembly including tests, Site offices, transportation and all facilities needed for erection on the required duration. Sanbouk constructions has successfully managed to finish the project on time with the best quality.

Leave a Reply

Your email address will not be published. Required fields are marked *