• Contract: BELBIS GAS PRESSURE REDUCTION STATION)
  • Contract date:
  • Client: EBB PETROLUM.
  • Scope of Work:
    • Construction of Pressure Reduction station capacity 20.000 CM/HR
    • “Civil / structure and steel works” in the city of 10th of Ramadan.
    • Construction of pressure Reduction station capacity 100.000 SCM/HR
    • “Civil / structure and steel works” in the city of 10th of Ramadan.
    • Construction of take-off station in 10th of Ramadan GASSCO for launching high-pressure gas from main line to Belbis and Abou Hamad.
    • Construction of pressure Reduction station for natural Gas Belbis from 70 bars to 7 bars.