• Contract: Al-Shabab Simple Cycle Power Plant (Deep Wells)
  • Client: Kharafi National.
  • Contract Date: 10/4/2011

 

  • Provide automatic rotary drilling rigs for construction work at site including all required piping. supports, wires and all accessories for good operative conditions.

 

  • Supply of all temporaries for construction and test work.

 

  • Providing all consumable material required for the construction work.

 

  • Wells drilling, 12″ uPVC casing, screens, gravels, cement bentonite injection, wellheads, electric log, well cleaning, well test and well pump installation complete with all accessories

 

  • Supply and install PVC duct bank 6″ include concrete casing as per drawing, excavation. backfilling, supply and construct reinforced concrete manholes/hand holes and all the necessary to complete the work as required and according to safety and quality standards.

 

  • Providing all required approved qualified direct and indirect manpower to complete the works.

 

  • Providing all planning, safety and quality staff.

 

  • Providing all required construction equipment and tools for performing the works on required project milestones.

 

  • Scaffolding supply, installation and dismantling if needed

 

  • Unpacking and checking of pumps before erection at site, loading of equipment from the storage area, transport of equipment to its erection place, unloading and Erection including test works.
  • Site offices, transportation and all facilities needed for erection on the required duration.
  • As built drawings and well logs.
  • Warrantee back-to-back for Sanbouk scope